The Bamako Water Storage Project is a key municipal livelihood project in the capital of Mali, West Africa, undertaken by the main EPC contractor. The scope covers the construction of two above-ground water storage tanks — one of 10 000 m³ and one of 6 000 m³ — located in the Baco area of Bamako, forming the regulating core of the urban water-supply system and ensuring stable pressure and continuous supply for surrounding residential and commercial areas. The tank inlet/outlet piping, pump-house interfaces and connection manifolds are designed to carry treated potable water under working pressures of up to PN16, with large-diameter connections frequently occurring at tank outlets, pump-station boundaries and pipe-material transition sections. Located in a tropical Sahel climate with distinct wet and dry seasons and concentrated rainfall, the site features soft backfill soil and a risk of uneven settlement for buried pipelines. The pipeline network deliberately mixes multiple materials — carbon steel, ductile iron and locally sourced PE (HDPE) — according to different service sections and load conditions, while a number of special-shaped fabricated pipelines and non-standard fittings are required to match on-site layout and equipment interfaces. These factors place high demands on dimensional accuracy, sealing performance, multi-material compatibility, underground anticorrosion capability and delivery coordination.

متطلبات العميل
During the tender phase, the main EPC contractor was confronted with a typical multi-source procurement dilemma: the tank piping integrated carbon steel, ductile iron and HDPE pipe sections from different suppliers, each following different standards, wall-thickness series and outer-diameter tolerances. Standard off-the-shelf fittings could not cover the actual OD deviation band at key transition joints, and rigid connections were vulnerable to leakage caused by ground differential settlement. In addition, a number of special-shaped fabricated pipelines and non-standard connection pieces fell outside any supplier’s standard catalogue, requiring custom design and machining. Procuring pipes, fittings, valves and connectors from separate vendors also created interface mismatches and ambiguous liability during commissioning. Translated into formal procurement specifications, the contractor required an integrated solution satisfying the following key requirements:
- Integrate carbon steel, ductile iron and PE pipes with mixed outer-diameter deviations while maintaining reliable sealing under PN16 working pressure;
- Provide custom-designed special-shaped fabricated pipelines and non-standard fittings matching the on-site layout and equipment interfaces;
- Supply a complete, matched set of pipes, fittings, valves and connectors from a single accountable source, avoiding multi-vendor interface conflicts;
- Resist leakage risk from buried-pipeline differential settlement and provide certain angular/axial deflection compensation;
- Gasket materials compliant with potable-water contact safety standards;
- Heavy-duty anticorrosion coating suited to tropical humid buried-soil conditions;
- Match the specified ISO/EN PN16 flange drilling patterns and minimise on-site hot-work cutting and welding to accelerate installation;
- Short customisation and delivery lead time to fit the construction window before the rainy season.
الحل
After reviewing the project drawings, as-built pipe OD survey records, working pressure, buried installation environment and construction-schedule constraints submitted by the main EPC contractor, the CFIC technical team proposed an integrated, multi-material, single-source solution combining custom fabricated pipelines, transition couplings, flexible connectors, dismantling joints and matched valve connections.
Where we differ from ordinary single-material suppliers:
- One-stop multi-material integration, not a single-material catalogue.Most suppliers only sell ductile iron, or carbon steel, or PE. CFIC integrates carbon steel, ductile iron and PE in one scope, so cross-material transition nodes are designed, sealed and delivered as a coordinated system rather than stitched together on site by the contractor;
- Non-standard special-shaped fabrication capability.Standard-catalogue vendors cannot supply the project’s special-shaped fabricated pipelines and non-standard fittings. CFIC’s in-house fabrication facility produces custom pipe geometries, reducing field cutting, welding and refabrication;
- Matched pipes, fittings, valves and connectors under one accountable source.Pipes, fittings, valves and connection joints are engineered to each other’s dimensions, eliminating multi-vendor interface mismatch and simplifying commissioning liability;
- Flexible connection at heterogeneous-material joints.Instead of relying on strict dimensional conformity like rigid flanges, CFIC’s flexible couplings and transition pieces absorb pipe OD variations while preserving PN16 sealing integrity, and provide settlement compensation;
- Short customisation-to-delivery cycle.An established custom-workflow and in-house engineering capability compress the tender-to-delivery timeline, fitting the tight pre-rainy-season construction window.

الهندسة والتخصيص
Given that several special-shaped fabricated pipelines and transition joints fell outside standard product ranges, the CFIC engineering department performed strength calculations according to PN16 design parameters based on customer field-measured pipe OD data, and custom-modified or custom-fabricated the pieces to cover the project-specific tolerance window.
- Special-shaped fabricated pipelines:custom formed and welded from carbon steel and ductile iron to the project drawings, with controlled dimensional tolerance and full weld inspection;
- Multi-material transition couplings:engineered transition pieces for carbon-steel→ductile-iron→PE changes, eliminating complex on-site fabrication;
- Flange drilling:custom machined strictly following the project-specified ISO/EN PN16 bolt-hole layout to match the EPC-supplied valves and equipment interfaces;
- Gasket material:food-grade EPDM rubber certified for potable-water service, resistant to tropical high-temperature ageing;
- Coating system:heavy-duty fusion-bonded epoxy (FBE) / epoxy anticorrosion coating optimised for humid tropical buried soil to mitigate soil corrosion and microbiological attack;
- Drawing approval:custom fabrication drawings issued for the main EPC contractor’s engineering approval prior to production.
Benefiting from CFIC’s in-house capability and mature custom workflow, the whole engineering-to-delivery cycle was tightly controlled to satisfy the pre-rainy-season construction timeline. This customisation and integration capability became one of the decisive factors for winning the order.
نتائج المشروع
All CFIC-supplied fabricated pipelines, transition couplings, connectors, dismantling joints and valve connections passed factory inspection and witnessed on-site hydrostatic pressure testing at PN16; no leakage was detected during commissioning. The integrated solution effectively accommodated multi-material pipe OD deviations and absorbed part of the ground differential-settlement displacement. On-site hot-work cutting and welding for more than 120% key joints was largely avoided. Average installation time per critical joint was reduced by approximately 60% compared with conventional rigid-flange field fabrication. The whole batch of materials for the 10 000 m³ and 6 000 m³ tanks was installed and commissioned before the main rainy season, supporting the milestone progress of tank piping and pump-station commissioning. To date, all connection points and pipelines have been in stable continuous operation with no reported seal-failure or leakage.
آراء العملاء
Statement from Project Manager, Main EPC Contractor of Bamako Water Storage Project: “Multi-material procurement from different suppliers caused serious OD-mismatch and interface problems at the tender stage. CFIC’s integrated solution — custom fabricated pipelines, transition couplings and matched valve connections under one accountable source — solved our sealing, fabrication and commissioning bottlenecks. The short custom drawing approval and delivery helped us beat the rainy-season deadline, and the on-site pressure-test performance fully met project specifications.”
دعوة للعمل
Tell us your pipe materials, pipe outer diameters, working pressure, medium and site installation conditions. Our engineers can recommend standard products or develop custom multi-material fabricated-pipe, fitting and valve-connection solutions for your water-supply, storage-tank, wastewater or pipeline-upgrade project — all under one accountable source.