Antecedentes del proyecto
The pump station is a key node in a municipal water-supply system in Senegal, undertaken by the main EPC contractor. Its piping system features a complex layout: constrained by pump-room equipment spacing and civil-structure space, the pipe routing incorporates a large number of non-standard special-shaped welded fittings and elbows. Off-the-shelf standard fittings cannot match the actual on-site routing and flange-mating requirements, so the project relies on custom-fabricated fittings produced to the client’s original equipment and piping drawings. All supplied pipework is finished with a 500 µm blue epoxy anti-corrosion coating, indicating a strict requirement for coating thickness, adhesion and durability in a tropical, high-humidity environment.

Requisitos del cliente
During the tender phase, the main EPC contractor faced a typical on-site fabrication dilemma. Because a large number of special-shaped welded fittings fall outside any standard product catalogue, the conventional alternative is on-site cutting and welding. However, on-site fabrication brings serious problems: welding quality is difficult to control, the limited field anti-corrosion conditions make it nearly impossible to achieve a uniform 500 µm epoxy coating, and the work consumes substantial construction time while placing extreme demands on local welder skills, leaving latent risks of weld corrosion and joint leakage in later operation. The contractor therefore required a turnkey custom-fabrication solution meeting the following key requirements:
- Custom fabricate all non-standard special-shaped welded fittings according to the client’s original equipment and piping drawings;
- Perform drawing deepening, dimensional review, flange hole-pattern matching and PN pressure-rating verification before production;
- Complete welding in a controlled workshop environment with professional welding procedures and weld seam non-destructive testing (NDT);
- Apply a uniform 500 µm blue epoxy anti-corrosion coating with verified adhesion, suitable for tropical humid service;
- Minimise on-site cutting, welding and coating work to compress the pump-station piping installation cycle;
- Short customisation and delivery lead-time aligned with the overall project schedule.

La solución
Reviewing the client’s original equipment and piping drawings, pipeline material, dimensions, flange specifications, PN pressure rating and the 500 µm blue epoxy coating requirement, Casttrust International proposed a complete custom-fabrication service — from drawing deepening and approval to workshop integrated welding and anti-corrosion finishing.
Where we differ from ordinary suppliers:
- Full-turnkey custom fabrication, not just standard-catalogue supply.Off-the-shelf vendors cannot supply these non-standard special-shaped fittings. Casttrust covers drawing deepening, custom welding and coating finishing in one accountable scope;
- Drawing deepening before production.Rather than fabricating directly from raw drawings, our technical team optimises and re-checks dimensions, flange hole patterns and PN rating with the client before any cutting starts;
- Controlled workshop welding with NDT.Professional welding procedures and weld-seam non-destructive testing ensure quality that cannot be guaranteed by on-site hand welding;
- Workshop-applied 500 µm blue epoxy coating.Uniform thickness and verified adhesion avoid the quality defects of on-site coating, delivering long-term corrosion resistance;
- Direct-to-assembly delivery.Finished fittings arrive ready for installation, drastically reducing on-site cutting, welding and coating work and shortening the piping installation cycle.

Ingeniería y personalización
Casttrust’s technical team carried out drawing deepening and optimisation based on the client’s original equipment and piping drawings. The team re-checked piping dimensions, flange hole patterns, PN pressure rating and the technical specification for the 500 µm blue epoxy coating, and issued processed fabrication drawings that were reviewed and confirmed by the client through multiple rounds before production.
- Drawing deepening:pipe routing dimension verification, flange bolt-hole matching against mating equipment and valves, and PN rating confirmation;
- Workshop welding:professional pipe fitting assembly, welding by qualified welders, and weld-seam non-destructive testing (NDT) to guarantee integrity;
- Anti-corrosion coating:the whole product finished with a 500 µm blue epoxy paint coating applied under controlled workshop conditions, ensuring uniform thickness and qualified adhesion;
- Drawing approval:processed drawings submitted to the client for multi-round review and confirmation prior to fabrication.
Benefiting from Casttrust’s in-house fabrication capability and mature custom workflow, the whole engineering-to-delivery cycle was tightly controlled, and the finished fittings could be directly assembled on site, effectively supporting the pump-station piping milestone.

Resultados del proyecto
All Casttrust-supplied special-shaped welded fittings passed factory inspection, including weld-seam NDT and 500 µm blue epoxy coating thickness/adhesion verification. The finished fittings were delivered on schedule and could be directly installed on site. The custom-fabrication solution largely eliminated on-site cutting, welding and coating work. Compared with conventional on-site fabrication, the pump-station piping installation cycle was significantly shortened, and the risks of weld corrosion and joint leakage in later operation were effectively avoided. The pump-station water-supply system has been operating reliably, with no reported coating failure, weld corrosion or leakage.

Comentarios de los clientes
Statement from Project Manager, Main EPC Contractor of the Senegal Pump Station Piping Project: “The complex pump-room layout required a large number of non-standard special-shaped fittings that no standard catalogue could cover. Casttrust’s turnkey service — drawing deepening, workshop welding with NDT and the 500 µm blue epoxy coating — solved our fabrication and anti-corrosion bottlenecks. Finished fittings could be installed directly on site, cutting our piping installation time and avoiding the quality risks of on-site welding and coating.”
CTA
Tell us your piping layout, pipe material, dimensions, flange specifications, PN pressure rating and coating requirements. Our engineers can recommend standard products or develop custom special-shaped welded fittings and anti-corrosion solutions for your water-supply, pump-station, wastewater or pipeline-upgrade project.