Item 1
Item 2
Item 3
Item 4
Item 5

Debrebrhan University water supply project

Table of Contents

Founded in 2007, DebreBerhan University is a non-profit public higher education institution located in the small city of Debreberhan in the Amhara region (population range 50,000-249,999).

In this project, our company provided a wide range of joints, flexible joints and other joint products for the establishment of the university, realized the connection of different pipelines, and provided a great role for the water supply of the university.

share to
Facebook
Twitter
LinkedIn

Classification

Recent News

Can FCD Repair Clamp Reduce Noise in Pipes?
  The constant banging or buzzing in plumbing setups often means more than just a small bother....
Can a Saddle Clamp Be Used in a High-Vibration Environment?
In high-vibration industrial environments, pipe stability is key. The short answer is yes—a well-made...
FCD vs FCTR Repair Clamps: Key Differences Explained
  Pipe repair clamps are essential in today’s pipeline upkeep. They provide a quick and dependable...
Easy PVC PE Half Collar Repair Clamp Installation Guide
A Break in Your Pipeline? Fix It Fast Without Cutting or Welding! Stopping the leak and reducing further...
related news
Can FCD Repair Clamp Reduce Noise in Pipes
Can FCD Repair Clamp Reduce Noise in Pipes?
Can a Saddle Clamp Be Used in a High-Vibration Environment
Can a Saddle Clamp Be Used in a High-Vibration Environment?
FCD vs FCTR Repair Clamps Key Differences Explained
FCD vs FCTR Repair Clamps: Key Differences Explained
Easy PVC PE Half Collar Repair Clamp Installation Guide
Easy PVC PE Half Collar Repair Clamp Installation Guide
en_USEnglish